• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • T&D News

CERC grants transmission licence to Bikaner-II Bhiwadi Transco

  • T&D India
  • July 19, 2021
L&T Solar | T&D India
Share

 

Central Electricity Regulatory Commission (CERC) has recently granted transmission licence to Bikaner-II Bhiwadi Transco Ltd, a project SPV of PGCIL.

 

In its order dated July 15, 2021, CERC granted transmission licence under Section 14 of the Electricity Act, 2003.

 

Bikaner-II Bhiwadi Transco Ltd is a wholly-owned subsidiary of PGCIL and a special purpose vehicle entrusted with development of “Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase II-Part F”, on Build, Own, Operate and Maintain (BOOM) basis.

PGCIL had won this project under the tariff-based competitive bidding (TBCB) mechanism when it quoted the winning bid of Rs.140.486 crore per year as levelized transmission charges.

The transmission project, involving several lines and substations, is expected to be commissioned by June 2022. Some of the key components of the projects include a 400kV switching station at Bikaner-II Pooling Station, a 400kV twin double-circuit line from Bikaner-II PS to the 400kV Khetri substation, four fixed line reactors, four 400kV line bays, etc.

Also read: CERC Allows BSES Discoms To Exit From PPA

PGCIL wins all five so far

The overall scheme, officially known as “Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1 GW) under Phase-II” has several components, denoted as Part A, Part B, etc. Each part is to be developed by a project SPV, under the TBCB mode.

PGCIL has so far won the following five of these sub-components:

  • Ramgarh New Transmission Ltd [Phase-II (Part A)]
  • Fatehgarh Bhadla Transco Ltd [Phase-II (Part B)
  • Sikar New Transmission Ltd [Phase-II (Part C)]
  • Sikar-II Aligarh Transmission Ltd [Phase-II (Part D)]
  • Bikaner-II Bhiwadi Transco Ltd [Phase-II (Part F)]

 

PGCIL has recorded various degrees of progress in the five projects. In each case, the project SPV has been acquired, in some others the transmission charges have been approved by CERC while in a few cases, CERC has granted the transmission licence.

Featured photograph fir illustration only

Tags
  • CERC
  • PGCIL
  • Rajasthan
  • TBCB
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
L&T to build 220kV transmission line in Ladakh
Sazler forms second joint venture in e-mobility space

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Tata Power collaborates with Salesforce to accelerate India’s clean energy transition
  • Made in India, Powering the World: Toshiba’s T&D Achievements in 2025
  • Siemens expands semiconductor-based circuit protection portfolio, introduces circular soft starter
  • Genus Power crosses 26-million smart meter deployment worldwide
  • Bidders shortlisted for Jalna intrastate-TBCB scheme in Maharashtra
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.