• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Power Equipment

L&T flags off 700MWe reactor end-shields to NPCIL

  • T&D India
  • August 14, 2021
L&T NPCIL | T&D India
Share

 

The heavy engineering arm of Larsen & Toubro, flagged-off the second end-shield for Nuclear Power Corporation of India Ltd’s (NPCIL) indigenously designed 700MWe pressurized heavy water reactors (PHWR), L&T said in a release.

These PHWRs end-shields will be used at the upcoming Gorakhpur Haryana Anu Vidyut Pariyojana (GHAVP) in Fatehabad district of Haryana.

The flag-off ceremony took place at L&T’s Hazira manufacturing complex in Gujarat, in the presence of dignitaries from NPCIL and L&T. The delivery was made three months ahead of schedule.

These end-shields form a crucial part of the pressurized heavy water nuclear power reactors (PHWRs) used to prevent the direct radiation field that comes from the reactor’s core region.

 

The manufacturing of end-shields (9m in diameter weighing 140 tonnes) involves critical machining, bi-Junction welding with stringent distortion control technology, the release said.

 

Also read : L&T To Supply 12 Steam Generators To Nuclear Power Corporation

Anil V. Parab, Senior Vice President and Head, L&T Heavy Engineering said “We thank NPCIL for entrusting L&T with the opportunity to be part of India’s nuclear power program since its inception. We are proud of delivering these critical equipment three months ahead of contractual delivery despite Covid-19 pandemic. L&T is fully committed to Honorable Prime Minister’s vision of “Aatmanirbhar Bharat” to dispatch 12 steam generators awarded to us under the 10×700 MWe PHWR fleet program, well ahead of its schedule.”

It may be recalled that L&T Heavy Engineering dispatched the first 700MWe steam generator for the GHAVP nuclear power project in March 2021, creating a new global benchmark in the nuclear manufacturing industry by producing the complex equipment in 36 months.

Bajel Projects | T & D India
Tags
  • GHAVP
  • L&T
  • NPCIL
  • PHWR
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
PGCIL projects capital expenditure of Rs.7,500 crore for FY22
We are proud partners in India’s energy transition: Siemens India

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Failure of 28 EHV transmission lines reported to CEA in 2024
  • EconiQ: Pioneering a Sustainable Future for Power Grids
  • Power minister inaugurates grid upgrade projects in UT of Jammu & Kashmir
  • CEA seeks suggestions for indigenous development of critical imported items
  • Infravision is thrilled to welcome Pradeep Kumar to the team as CEO, India.
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.