• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • View Point

Devtosh Chaturvedi, MD, Feedback Energy Distribution Co Pvt Ltd (FEDCO)

  • T&D India
  • March 16, 2018
Devtosh Chaturvedi FEDCO
Share

There is an urgent need to re-evaluate the model contours of private sector participation in the power distribution space. The existing IBDF (input-based distribution franchisee) model was conceptualized about 12 years back with the realities that were relevant then. The sector has undergone changes since then and current realities are different from the time when this model was conceptualized. “One size fits all” does not cater to today’s need, hence need of the hour is to work our multiple models of private sector participation to help discoms achieve their objectives within the specified time.

Discoms of today have sufficient capital expenditure sanction to allocate to the overall improvement of the network, hence private sector funds may not be their requirement. But they need urgent support in areas such as high accountability, technology adoption in field, time-bound improvement and players who are ready to work in a rural-urban combine instead of pure urban areas.

Combining the requirements, what should emerge is an alternate capex-light model for private players so that they can replicate their process, technology to improve and transform multiple areas.

Devtosh Chaturvedi in an exclusive interaction with T&D India

Bajel Projects | T & D India
Tags
  • discoms
  • FEDCO
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Shreegopal Kabra, President, IEEMA
Subhash Sethi, Chairman, SPML Infra Ltd

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Akhilesh Kumar Dixit appointed CEO of EESL
  • Failure of 28 EHV transmission lines reported to CEA in 2024
  • EconiQ: Pioneering a Sustainable Future for Power Grids
  • Power minister inaugurates grid upgrade projects in UT of Jammu & Kashmir
  • CEA seeks suggestions for indigenous development of critical imported items
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.