• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • T&D News

PGCIL approves refurbishment of Chandrapur back-to-back HVDC station

  • T&D India
  • December 18, 2025
Share

Power Grid Corporation of India Ltd (PGCIL) has approved capital expenditure for refurbishing the Chandrapur back-to-back HVDC station in Maharashtra.

In a brief stock exchange filing, PGCIL said that the company’s board of directors, in its meeting held on December 17, 2025, accorded investment approval for “Refurbishment of Bhadrawati (Chandrapur) HVDC (2×500 MW) back-to-back system” with an estimated cost of Rs.1,226.93 crore.

The investment will be made under “Additional Capital Expenditure 2024-29 Tariff Block” and the project is scheduled to commission in 36 months from the date of award.

 

Mandate placed

Meanwhile, in an independent development, GE Vernova T&D India Ltd, in a stock exchange communication dated December 17, 2025, announced the winning of a letter of award from Power Grid Corporation of India Ltd (PGCIL) for refurbishment of 2×500-MW HVDC Chandrapur back-to-back link between Northern and Southern part of India. The scope of project includes upgrade of HVDC thyristor valves and HVDC controls & protection. The order completion period is spread over multiple years, the stock exchange communication said.

 

Sasaram HVDC station

PGCIL is also planning to upgrade its Sasaram back-to-back HVDC station at an estimated project cost of Rs.3,440 crore. This upgrade will be be implemented under the regulated tariff mechanism (RTM) framework. Commissioned in 2002, the Sasaram back-to-back HVDC station is approaching the end of its useful life span, warranting the upgrade. (Read tndindia.com story dated November 11, 2025)

 

Back-to-back HVDC station

A back-to-back HVDC station is one where both the HVDC converters are located in the same building and the length of the DC line is kept to the minimum. India’s first back-to-back HVDC station was commissioned at Vindhyachal in Madhya Pradesh, in 1989. Following this, other such HVDC stations were put up at Chandrapur in Maharashtra (1997), Sasaram in Bihar (2002) and Guzuwaka in Andhra Pradesh (2005).

 

Featured photograph (source: GE Vernova T&D India Ltd) is for representation only

 

Tags
  • Chandrapur
  • GE Vernova T&D India
  • HVDC
  • PGCIL
  • POWERGRID
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
India remains one of our fastest-growing markets: Wirepas
Salasar Techno secures 400kV transmission line project in Uttar Pradesh

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Siemens expands semiconductor-based circuit protection portfolio, introduces circular soft starter
  • Genus Power crosses 26-million smart meter deployment worldwide
  • Bidders shortlisted for Jalna intrastate-TBCB scheme in Maharashtra
  • PGCIL set to fully commission Kurnool RE evacuation scheme soon
  • Apraava Energy commissions Fatehgarh IV interstate-TBCB scheme in Rajasthan
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.