• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Orders & Contracts

Andritz wins electromechanical package for Gandhinagar PSP from Greenko

  • T&D India
  • September 29, 2022
Andritz Gandhisagar contract signing | T&D India
Share

 

ANDRITZ has won the contract to undertake electromechanical works related to the Gandhisagar pumped storage project (PSP) in Madhya Pradesh.

The order was placed by project owner Greenko MP01 IREP Pvt Ltd, part of the Greenko Group, for the 1,440-MW PSP located in Kheemla block village in Neemuch district.

 

The project envisages utilizing existing Gandhi Sagar reservoir as lower reservoir and construction of an upper reservoir.

 

The contract includes design, manufacture, supply, transportation, erection, testing, and commissioning of five 240-MW units, two 120-MW reversible pump units, main inlet valves, and associated auxiliaries.

The works will be undertaken by ANDRITZ’s multiple locations led by its Indian subsidiary with state-of-the-art manufacturing facilities in India. Greenko has again reposed faith in ANDRITZ due to its execution excellence with the second contract after having awarded the Pinnapuram PSP in Andhra Pradesh, earlier in 2020.

This order not only confirms once again ANDRITZ’s strong position in the Indian hydro market, but also for pumped storage technology, which plays an important role in providing grid stability to cope with volatile solar and wind power supplies, a release from ANDRITZ said.

Greenko, one of India’s leading renewable energy companies is committed towards transforming renewable energy from real-time energy to a dispatchable and controlled medium, through digitization and storage solutions to support the economy-wide shift towards a carbon-neutral electricity mix in India, the release added.

Also read: ANDRITZ Completes R&M And Up-Rating Of Tiloth Hydropower Plant

Featured photograph shows the contract signing ceremony between ANDRITZ and Greenko Group for the Gandhinagar PSP in Madhya Pradesh.

 

Bajel Projects | T & D India
Tags
  • Andritz
  • Gandhinagar PSP
  • Greenko
  • Madhya Pradesh
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
India’s first high-power supercapacitor from GODI India
EHV cables is emerging as a growth driver: KEC International

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Akhilesh Kumar Dixit appointed CEO of EESL
  • Failure of 28 EHV transmission lines reported to CEA in 2024
  • EconiQ: Pioneering a Sustainable Future for Power Grids
  • Power minister inaugurates grid upgrade projects in UT of Jammu & Kashmir
  • CEA seeks suggestions for indigenous development of critical imported items
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.