Uttar Pradesh, Maharashtra and Tamil Nadu are the top three states with respect to project cost sanctioned under the Revamped Distribution Sector Scheme (RDSS).
The National Committee on Transmission is soon expected to deliberate on whether GIS (gas insulated switchgear) technology would be a better alternative to the originally proposed air-insulated substation, in connection with transmission systems planned for wind energy evacuation offshore Tamil Nadu.