• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • Renewables

First Concrete Pour for World’s largest Integrated Renewable Energy Storage Project

  • T&D India
  • May 17, 2022
Greenko IRESP | T&D India
Share

 

Andhra Pradesh Chief Minister Y. S. Jagan Mohan Reddy on May 17, 2022, performed the “first concrete pour ceremony” of the world’s largest integrated renewable energy storage project  being implemented by Greenko Group, at Kurnool District, Andhra Pradesh.

The 5,230-mw integrated renewable energy storage project will play a pivotal role in India attaining energy security and enable global energy transition, a release from Greenko Group said.

This is a first of its kind single location energy storage project with wind and solar capacities. This project is being implemented with an investment of over $3 billion comprising pumped storage (10,800 MWh of daily storage), solar (3,000 MW) and Wind (550 MW). The project is scheduled to get commissioned by last quarter of 2023.

National precedent

Noting that history is being created with the project, the Y S Jagan Mohan Reddy, Chief Minister of Andhra Pradesh said, “What Andhra Pradesh is showcasing (with the project) will be a triggering point for the entire country to follow in the days to come. The usage of fuel of fossil fuel would take a back seat and Renewable Energy front seat.”

 

He also appreciated the Greenko Group for the initiation of setting up the world’s largest renewable energy storage facility. “The project envisages clean energy round the clock,” said the Chief Minister.

 

“We offer an exclusive opportunity for people interested in green power and decarbonizing the economies. Our topography is such that we have the capacity of 33,000 MW available in the state, and this project will show the country how green power can be generated,” Jagan Mohan Reddy said.

Moment of pride

Speaking on the occasion, Anil Chalamalasetty, Founder, CEO & MD, Greenko Group said, “It’s a moment of great pride for Greenko that we have pioneered to deliver, ahead of global ambition of a 24/7 dispatchable renewable energy solution, for industrial decarbonization and energy transition.”

Also read: NTPC Subsidiary In Pact With Greenko For RTC Power Supply

Energy storage capital

“Given the State’s favourable topography for pumped storage projects, Andhra Pradesh is set to become an energy storage capital of India. This integrated solution is pivotal for the Nation to become energy independent and establishes it as a leader of decarbonized economies. With this project, Greenko has pioneered the concept of storage contracts with central utilities and large industries,” noted  Chalamalasetty.

 

Featured photograph shows Andhra Pradesh Chief Minister Y. S. Jagan Mohan Reddy performing first concrete pour for world’s largest integrated renewable energy storage project by Greenko at Kurnool, along with Anil Chalamalasetty, Founder, CEO & MD, Greenko Group.

Tags
  • Andhra Pradesh
  • Greenko
  • integrated renewable energy storage project
  • IRESP
  • Kurnool
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Saint-Gobain India and Sembcorp sign green energy supply agreement
Tata Power partners with Hyundai Motor for EV charging infra

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Siemens expands semiconductor-based circuit protection portfolio, introduces circular soft starter
  • Genus Power crosses 26-million smart meter deployment worldwide
  • Bidders shortlisted for Jalna intrastate-TBCB scheme in Maharashtra
  • PGCIL set to fully commission Kurnool RE evacuation scheme soon
  • Apraava Energy commissions Fatehgarh IV interstate-TBCB scheme in Rajasthan
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.