• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Power Equipment

L&T flags off 700-MWe steam generator for Kaiga atomic power station

  • T&D India
  • July 12, 2024
Share

The Heavy Engineering vertical of Larsen & Toubro (L&T) has despatched the second steam generator to Kaiga atomic power station of Nuclear Power Corporation of India Ltd (NPCIL), in Karnataka.

This steam generator is part of India’s indigenously developed 10 x 700 MWe Pressurised Heavy Water Reactor (PHWR) Fleet Programme.

The event took place from L&T’s A M Naik Heavy Engineering Complex in Hazira, Gujarat, on June 12, 2024.

The flag-off comes 11 months ahead of the contractual delivery schedule, demonstrating L&T’s unwavering commitment to advancing India’s nuclear power programme and helping the country meet its net zero carbon emissions target by 2070. L&T delivered the first steam generator to the Kaiga atomic power station in March 2024.

 

A steam generator is a crucial heat exchanger that converts water into steam using the heat generated within a nuclear reactor core.

 

Global benchmark

Speaking on the flag-off, Anil V Parab, Whole-time Director & Sr Executive Vice President – L&T Heavy Engineering & L&T Valves, emphasised L&T’s commitment to excellence and customer delight by leveraging Industry 4.0 and cutting-edge manufacturing techniques. “L&T Heavy Engineering, as an industry trendsetter, continue to create global benchmarks in delivery of critical nuclear equipment. Eleven-month early delivery of this second steam generator is another example of consistency and resilience even during pandemic and supply chain disruptions. We are fully geared up as the trusted and dedicated partner of the Department of Atomic Energy / NPCIL to triple the current installed nuclear power capacity to 100 GWe by 2047.” he said.

Also read: L&T Wins Mega Solar Orders In Middle East

Bajel Projects | T & D India
Tags
  • Kaiga
  • Kaiga atomic power plant
  • Karnataka
  • L&T
  • Larsen & Toubro
  • NPCIL
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
JSW Group in tripartite agreement for Smart Grid Centre of Excellence
RMC Switchgears lands solar EPC order in Gujarat

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • CEA seeks suggestions for indigenous development of critical imported items
  • Infravision is thrilled to welcome Pradeep Kumar to the team as CEO, India.
  • Joda-Barbil intrastate scheme in Odisha: Bidding annulled for the second time
  • Sugs Lloyd wins power T&D projects in Bihar and Odisha
  • H.G. Infra Engineering emerges L1 for ERGS-I scheme in Odisha
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.