• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • T&D News

POSOCO conducts training program for power system modeling

  • T&D India
  • April 21, 2022
POSOCO Illustrative | T&D India
Share

 

National Grid operator Power System Operation Corporation Ltd (POSOCO) is organising a two-week training program on ‘Power System Modelling and Simulation’.

Inaugurated at the hands of Ministry of Power’s Secretary Alok Kumar on April 18, 2022, the program will continue up to April 29, 2022.

The training program is being attended by participants from Bangladesh, Bhutan, India, Nepal and Sri Lanka in New Delhi. The workshop is being organized in close association with The Integrated Research & Action for Development (IRADe).

The program is being delivered by engineers from POSOCO and it would include self-assessment tests on major functional areas covered in the course followed by interactive sessions with senior executives and industry experts.

 

The participants would also get an opportunity for field visits to the world’s first multi-terminal HVDC station at Agra.

Also read: TERI And POSOCO Sign MoU For Power Sector Research

The Power System Modeling and Simulation training program is designed to familiarize participants from the basics to the advanced levels of the power systems. This course has a theory as well as hands-on sessions on the power system, per unit system, modeling of power system elements, steady-state load flow studies, fault analysis, dynamic modeling and simulations, reactive power studies, transfer capability assessment and optimal power flow, a POSOCO release said.

 

Featured photograph (source: POSOCO) is for representation only

Tags
  • POSOCO
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Oil India commissions India’s first green hydrogen plant
CERC directs PGCIL to issue public notice for Sikar transmission scheme

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Siemens expands semiconductor-based circuit protection portfolio, introduces circular soft starter
  • Genus Power crosses 26-million smart meter deployment worldwide
  • Bidders shortlisted for Jalna intrastate-TBCB scheme in Maharashtra
  • PGCIL set to fully commission Kurnool RE evacuation scheme soon
  • Apraava Energy commissions Fatehgarh IV interstate-TBCB scheme in Rajasthan
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.