• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Renewables

Presidential nod received for new solar power electrification scheme

  • T&D India
  • January 8, 2024
Saubhagya
Share

 

The Ministry of New & Renewable Energy (MNRE) has received Presidential sanction for the implementation of a new solar power scheme to be implemented in tribal areas.

The scheme with an approved financial outlay of Rs.515 crore will cover PVTG (particularly vulnerable tribal groups) habitations and villages under the Pradhan Mantri Janjati Adivasi Nyaya Abhiyan (PM JANMAN). The implementation period of the scheme will be from 2023-24 to 2025-26.

The scheme will cover electrification of 1 lakh un-electrified households in PVTG areas identified by Ministry of Tribal Affairs (MoTA) and located in 18 states and one Union Territory.

 

Electrification will be provided by off-grid solar systems where electricity supply through grid is not techno-economically feasible. The scheme also provides for solar lighting in 1,500 multipurpose centres (MPC) in PVTG areas where electricity through grid is not available.

 

Coverage

The new scheme will cover the states of Andhra Pradesh, Bihar, Chhattisgarh, Gujarat, Jharkhand, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Manipur, Odisha, Rajasthan, Tamil Nadu, Telangana, Tripura, Uttar Pradesh, Uttarakhand, West Bengal and the UT of Andaman & Nicobar Islands.

 

Financial outlay

The first component of the scheme includes provision of 0.3kW solar off-grid systems for 1 lakh PVTG households with a total outlay of Rs.500 crore (@Rs.50,000 per household). The second part, with an outlay of Rs.15 crore, will cover solar streetlights and provision of solar lighting in 1,500 MPCs of PVTG areas (@Rs.1,00,000 per MPC).

 

Fund allocation

The funds for implementation of this scheme would be met from the DAPST (Development Action Plan for the Scheduled Tribes) allocation of MNRE with an overall approved outlay of Rs.515 crore. A separate budget line “PM JANMAN” has been opened for the purpose. The year-wise fund allocation would be:

 

Effective date

The implementation of the scheme will come into effect from the date of issue of administrative approval along with issuance of implementation guidelines.

 

Comprehensive scheme

The Rs.515-crore for solar lighting discussed in this story is part of a comprehensive Rs.24,104-crore programme aimed at improving the socio-economic conditions of PVTGs. The programme, cleared by the Union Cabinet in November 2023, also touches upon provision of pucca houses, connecting roads, piped water supply, etc. The overall programme will be implemented through nine Union ministries.

 

PVTG

As per the 2011 Census, India has a population of 10.45 crore Scheduled Tribes. Included here are 75 communities – spread over 18 states and 1 UT (listed above) – that have been categorized as Particularly Vulnerable Tribal Groups (PVTGs).  These PVTGs continue to face vulnerability in social, economic and educational fields.

 

Bajel Projects | T & D India
Tags
  • MNRE
  • off-grid electrification
  • PM JANMAN
  • PVTG
  • solar lighting
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Eight contenders qualify for ISTS scheme in Madhya Pradesh
Techno Electric wins power T&D orders worth nearly Rs.1,700 crore

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • CEA seeks suggestions for indigenous development of critical imported items
  • Infravision is thrilled to welcome Pradeep Kumar to the team as CEO, India.
  • Joda-Barbil intrastate scheme in Odisha: Bidding annulled for the second time
  • Sugs Lloyd wins power T&D projects in Bihar and Odisha
  • H.G. Infra Engineering emerges L1 for ERGS-I scheme in Odisha
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.