transmission line upgrade

Grid Before Generation and the Critical Need for RoW Reform

As renewable energy capacity expands rapidly, the limiting factor is increasingly not the availability of generation, but the availability of transmission infrastructure.  If India can combine large-scale new transmission investment with systematic reconductoring, conductor uprating, voltage upgrades and Read more