• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • News

Union power secretary reviews report on coal stocks at power plants

  • T&D India
  • August 30, 2021
coal
Share

 

Union power secretary Alok Kumar, on August 29, 2021, reviewed a report by the Core Management Team (CMT). The team,  comprising representatives from the Union ministry of power, Coal India Ltd, Central Electricity Authority (CEA) and Indian Railways, is working on modalities to improve the coal stock position at thermal power generation units.

 

The report of the CMT contains the following highlights:

  • The regulation of coal to the power plants having more than 15 days’ stock, would free up around 1.77 lakh tonnes of coal from 26 stations. This coal has been redistributed to the plants having super critical and critical coal stocks at power plants.

 

  • NTPC’s 2×800-mw Darlipali thermal power plant will source coal from the captive mine of Odisha Coal & Power Ltd (OCPL). Incidentally, Unit-2 of NTPC Daralipali will achieve commercial operation, effective September 1, 2021.

 

  • Damodar Valley Corporation (DVC) would be clearing dues to the tune of Rs.1,200 crore to different CIL subsidiaries within the first week of September 2021. This will augment coal supply to different plants of DVC. This would ramp up DVC’s overall plant load factor (PLF) to 90 per cent from the current 61 per cent.

 

  • The 1,000-mw Kudankulam nuclear power station of NPCIL would be back on generation mode before September 2, 2021. This nuclear power generation will reduce coal-fired electricity, resulting in lesser coal demand.

 

  • Around 6,000 mw worth of coal-fired power generation capacity at Mundra, designed on imported coal, have around 30 days of coal stock. However, these plants are not supplying power due to PPA-related issues. The power ministry is scheduled to meet on August 30, 2021 to resolve the issues. If resolved, these power plants can resume generation, thereby reducing the requirement for domestic coal.

Also read: Upcoming Union Budget Likely To Focus On Power Distribution

The CMT is closely monitoring the coal stocks on daily basis and ensuring follow up actions with CIL, Railways to improve the coal supply to power plants, a government release said.

Bajel Projects | T & D India
Tags
  • coal
  • Core Management Team
  • power plants
  • Union power
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Delhi Power Minister visits Tata Power DDL’s battery storage system, South-Asia’s largest
L&T wins turnkey order to build substation in Saudi Arabia

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Power minister inaugurates grid upgrade projects in UT of Jammu & Kashmir
  • CEA seeks suggestions for indigenous development of critical imported items
  • Infravision is thrilled to welcome Pradeep Kumar to the team as CEO, India.
  • Joda-Barbil intrastate scheme in Odisha: Bidding annulled for the second time
  • Sugs Lloyd wins power T&D projects in Bihar and Odisha
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.