• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Renewables

Load-flow studies for green energy evacuation in Andhra Pradesh

  • T&D India
  • October 5, 2020
Mercom
Share

New & Renewable Energy Development Corporation of Andhra Pradesh Ltd (NREDCAP) has initiated steps to implement power transmission systems for power evacuation from upcoming renewable energy projects.

This follows tremendous interest from developers to set up renewable energy projects under the AP Renewable Energy Export Policy 2020.

NREDCAP, upon the suggestion of Central Electricity Authority (CEA), has approached APTransco, the state power transmission utility, to conduct load-flow studies in districts such as Kurnool, Kadapa and Anantapur. These locations are predominantly favourable for wind energy projects.

NREDCAP, it may be mentioned, has identified five locations — Kolimigundla (Kurnool), Puttaparthi, Kalyanadurgam and Kadiri (Anantapur), and Badvel and Kalasapadu (Kadapa) — for the establishment of ultra mega renewable energy power parks with an aggregate capacity of 4 to 5 GW.

Solar Energy Corporation of India (SECI) Ltd and NTPC Ltd are keen to develop green energy projects in the above areas, it is learnt.

It should be noted that there are already plans to set up interstate transmission projects of 4,500 mw in Kurnool district and 3,500 mw in Anantapur district. These plans are being implemented by Power Grid Corporation of India Ltd.

The CEA has now suggested that load-flow studies be now taken up to identify interstate system strengthening, if required, for integration of renewable energy capacity within the state. As per the provisions of our export policy, power can be exported to other states by accessing the interregional grids.

The power transmission infrastructure available for projects to be set up under the AP Renewable Energy Export Policy 2020 is tabulated below:

Andhra Pradesh

Besides, two transmission systems, currently under construction by PGCIL, will be available in future. These are Kurnool (transmission capacity: 5.5 GW) and Ananthapur (2.5 GW). Moreover, new substations/systems have also been proposed at Obuladevaracheruvu, Kadiri and Badvel.

 

(Note: New & Renewable Energy Development Corporation of Andhra Pradesh Ltd (NREDCAP) was formerly known as Non-Conventional Energy Development Corporation of Andhra Pradesh Ltd.)

Featured photograph for illustration only

Bajel Projects | T & D India
Tags
  • Andhra Pradesh
  • NREDCAP
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
NTPC holds Vendors Meet to promote AtmaNirbhar Bharat
Odisha CM inaugurates three power transmission elements

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • CEA seeks suggestions for indigenous development of critical imported items
  • Infravision is thrilled to welcome Pradeep Kumar to the team as CEO, India.
  • Joda-Barbil intrastate scheme in Odisha: Bidding annulled for the second time
  • Sugs Lloyd wins power T&D projects in Bihar and Odisha
  • H.G. Infra Engineering emerges L1 for ERGS-I scheme in Odisha
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.