• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • International News

ANDRITZ wins order for Austrian pumped storage plant

  • T&D India
  • February 23, 2021
Andritz | T&D India
Share

International technology group ANDRITZ has received an order from TIWAG-Tiroler Wasserkraft AG (TIWAG) to supply two motor-generators for the new Kühtai 2 pumped storage power plant in Austria.

Commissioning is scheduled for 2026

International technology group ANDRITZ has received an order from TIWAG-Tiroler Wasserkraft AG (TIWAG) to supply two motor-generators for the new Kühtai 2 pumped storage power plant in Austria. Commissioning is scheduled for 2026.

The scope of supply for ANDRITZ includes two variable-speed motor-generators, each with a rated output of 95 MVA, including auxiliary equipment. The variable-speed generators will be connected to the grid via full-size converters and enable efficient and optimized operation within the defined head variations. Speed control is used both for controlling output in pumping mode and for extending the operating range in turbine mode.

Andritz

 

The Kühtai 2 pumped storage power plant is an extension of the existing Sellrain-Silz power plant group in the Längen Valley of the Tyrolean Stubai Alps and will be built completely underground in a cavern. Kühtai 2 and the new Kühtai reservoir will increase the generating capacity of the entire power plant group by 50 percent.

Also read: Indian Arm Of ANDRITZ Entrusted With Nepal Hydropower Contract 

The power plant group serves as a sustainable energy storage facility to cover peak loads and thus contributes significantly towards stabilizing the power grids and increasing security of energy supply.

Featured photograph shows site of the planned Kühtai reservoir and dam while inside photograph shows 3D-artwork of the new underground pumped storage power plant Kühtai-2. (Photos: Andritz)

Tags
  • Andritz
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Power Minister R.K. Singh administers oath to new Member, CERC
Vikram Solar makes entry into Telangana market, partners with 3S Solutions

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Completion schedules of RTM and TBCB components of Krishnagiri interstate scheme aligned
  • CG Power commissions EHV switchgear facility in Nashik
  • BPE launches “BPE Active Tile” for legacy data centres
  • Power ministry committee holds meeting on grid stability
  • Atlanta Electricals wins Rs.285-crore order from Punjab state transco
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.