Posts by T&D India

Pole-2 of Raigarh-Pugalur HVDC link starts commercial operations | T&D India

Substation capacity sees spurt in March 2021

Though substation capacity addition in FY21 as a whole fell short of the target, the performance in the month of March 2021 was interesting to observe. As discussed in a recent exclusive study by T&D India, the country’s total Read more

THDC India appoints Vijay Goel as CMD

THDC India Ltd, in a release, announced the appointment of Vijay Goel as the company’s Chairman and Managing Director. The release noted that Goel has been entrusted with this additional charge, effective Read more

Dr Hitesh Doshi, CMD, Waaree Group LR | T&D India

Dr Hitesh Doshi, Chairman and Managing Director, Waaree Group

“We welcome and appreciate the Government's announcement on the PLI Scheme. The Government has taken this step to push manufacturing in India, which is certainly the need for the country's solar sector today. India is the third largest solar Read more

Wind Solar Hybrid - LR | T&D India

JSW Energy signs PPA with SECI for blended wind capacity

A step-down wholly-owned subsidiary of JSW Energy Ltd has signed a power purchase agreement (PPA) with Solar Energy Corporation of India (SECI) for wind-solar hybrid capacity. JSW Renew Energy Ltd, a wholly-owned subsidiary of JSW Future Energy Ltd, has Read more

GIS

Transformation capacity addition falls 16 pc in FY21

  India’s addition of transformation capacity, through substations of 220kV or more, was 16 per cent lower year-on-year in FY21. According to latest statistics released very recently by Central Electricity Authority (CEA), India added 57,575 MVA of transformation capacity in Read more

ARBL Amara Raja Batteries | T&D India

Amara Raja Batteries: APPCB orders immediate closure of two units

Andhra Pradesh Pollution Control Board (APPCB) has ordered immediate closure of two manufacturing units of Amara Raja Batteries Ltd (ARBL) located in the southern state. In a stock exchange filing, ARBL said that it has received closure orders dated Read more

TPDDL

Tata Power DDL gears up to meet record peak summer demand

Tata Power Delhi Distribution Ltd (Tata Power-DDL) has estimated a peak electricity demand of about 2,150 mw this summer season and made an arrangement of up to 2,400 mw, the power utility catering to north Delhi said in Read more

ABB BALCO Smelter LR | T&D India

Core sector output falls 7 per cent in FY21

Production of eight core industries declined 7 per cent in FY21, according to government statistics released recently. The combined output of eight core sector industries—coal, crude oil, natural gas, refinery products, fertilizers, steel, cement and electricity—was down 7 per Read more

Vikram Solar

Gyanesh Chaudhary, Managing Director, Vikram Solar

"Vikram Solar welcomes the MNRE's latest guidelines for the production-linked incentive (PLI) scheme, which is a great and decisive step towards making India "Aatmanirbhar". As a domestic solar manufacturer we have high hopes from the PLI scheme as Read more

GE R&D | T&D India

GE T&D India to redeploy excess employees of Global Engineering Operations Division

GE T&D India, in a stock exchange notification, has said that it was considering redeployment of excess employees in its Global Engineering Operations Division. In the notification, GE T&D India said that it enters into short-term, non-exclusive contracts and/or Read more