• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • Renewables

Azure Power signs PPA for over 2 GW with SECI, wins second hybrid project

  • T&D India
  • December 18, 2021
Azure Power Punjab | T&D India
Share

 

Azure Power has announced that it has signed its largest-ever power purchase agreements (PPAs) with Solar Energy Corporation of India (SECI) for a capacity of 2,333 mw of ISTS-connected solar power projects under the 4 GW manufacturing linked projects.

This follows the 600-mw PPA signed during last month under the same tender. Projects developed under this PPA will supply power for 25 years at a fixed tariff of Rs.2.42 per kwh and shall be constructed in Rajasthan, the highest solar insolation state in India.

Connectivity approval for these projects is already in place and land is fully identified and is under acquisition. Commissioning of these projects is scheduled in a phase-wise manner:

 

  • 1,000 mw by November 2024
  • 1,000 MW by November 2025
  • 333 MW by November 2026

 

 

Long runway of growth

“We are pleased with our progress on the 4 GW projects with SECI. This is the largest capacity PPA ever for Azure Power in its decade long journey in the renewable energy sector and provides us with an incredible opportunity to support India’s resolve on climate change and being a destination of choice for global investments,” says Ranjit Gupta, MD & CEO, Azure Power. “We are confident that these PPAs and the hybrid projects are a significant step forward in creating a long runway for growth and value accretion for our stakeholders, which we will continue to strengthen with our prudent choice of projects and capital deployment,” added Gupta.

Read more: Sembcorp Energy India, Azure Power Clinch Wind Projects In SECI Auction

Second wind-solar hybrid project

Azure Power also announced that it has received the letter of award (LOA) for its second wind–solar hybrid power project of 200 mw from Maharashtra State Electricity Distribution Co Ltd (MSEDCL) to supply power for 25 years at a fixed tariff of Rs.2.62 per kwh and will entail setting up of 133 mw solar and 67 mw wind capacity within a period of 18 months from the signing of PPA. Solar capacity for the project will be set up in Rajasthan, while the wind capacity will be in Maharashtra.

Tags
  • Azure Power
  • MSEDCL
  • SECI
  • wind solar hybrid
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
KEC International wins diversified orders worth over Rs.1,000 crore
Power PSUs meet 63.4 per cent of FY22 capex target, so far

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Completion schedules of RTM and TBCB components of Krishnagiri interstate scheme aligned
  • CG Power commissions EHV switchgear facility in Nashik
  • BPE launches “BPE Active Tile” for legacy data centres
  • Power ministry committee holds meeting on grid stability
  • Atlanta Electricals wins Rs.285-crore order from Punjab state transco
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.