• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • T&D News

CG rolls out first transformer from its Sehore facility in Madhya Pradesh, India’s largest

  • T&D India
  • September 4, 2026
Share

CG Power and Industrial Solutions Ltd (CG) has announced the rollout of the first power transformer from its new greenfield facility at Sehore, Madhya Pradesh.

Spread over 50 acres, this facility is India’s largest single-location power transformer manufacturing facility built for 220kV to 1200kV class power transformers with a capacity to rollout 35 power transformers every month. Gracing the occasion of the first transformer rollout was the Hon’ble Chief Minister of Madhya Pradesh, Dr. Mohan Yadav.

The facility strengthens CG’s ability to serve critical sectors such as utilities, data centres, railways, renewable energy, oil and gas, and transmission infrastructure projects, globally. It will also support the company’s growing export business, a release from CG said.

 

Strengthening India’s HV equipment capability

Hon’ble Chief Minister of Madhya Pradesh, Dr. Mohan Yadav, said, “Power is a critical component in achieving our Prime Minister, Mr. Narendra Modi’s vision of Viksit Bharat by 2047. A facility such as this one, strengthens India’s capability in high-voltage transmission equipment and supports our transition from a power-deficit to a power-sufficient nation. Additionally, industrial investment of this nature in Madhya Pradesh generates opportunity for the local youth and uplifts communities. This facility from CG will create over 2,000 direct and indirect employment in Sehore. Our government will continue to ensure that every investment proposal signed in Madhya Pradesh becomes a working factory on the ground and continues to benefit the people of Madhya Pradesh.”

 

The Sehore plant’s rated capacity is 45,000 MVA per year, to be achieved in three phases. CG’s total capacity for transformers, in conjunction with capacity expansions at other plants, is seen rising to 1,20,000 MVA once the Sehore plant is fully commissioned.  (Read exclusive tndindia.com interview with Ajay Jain, Vice President – Transformers, CG)

 

Pioneering electrical infrastructure

Vellayan Subbiah, Chairman, CG Power and Industrial Solutions Ltd, said, “India is on track to become the world’s third largest economy by 2030 and with it the demand of electricity will increase. CG has been among the pioneers of electrical infrastructure equipment including transformers and switchgears for close to nine decades and this legacy is showcased at our new Sehore facility. Built at scale to manufacture the world’s largest power transformers, this facility will supplement the demand for power infrastructure equipment and also contribute to exports.”

 

Up in 13-14 months

Amar Kaul, Group CEO and Managing Director, CG Power and Industrial Solutions Ltd said, “When the Hon’ble Chief Minister performed the bhoomi pujan of this plant in August 2025, we committed to building it at speed. The first transformer rollout today is a tangible outcome of agility, collaboration and ownership mindset with which the facility was built. Bringing this facility to life within 13 -14 months was made possible through the immense support of the Madhya Pradesh Government, and our execution excellence engine – CG EDGE. Cross-functional teams worked as #OneCG to accelerate execution while maintaining high standards of quality and safety.”

 

Also Read: CG plans greenfield power transformer facility, Rs.700-crore capex approved (January 29, 2025)

 

Tags
  • CG
  • Madhya Pradesh
  • power transformers
  • Sehore
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Energy storage made mandatory for RE generation plants effective July 2027

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • CG rolls out first transformer from its Sehore facility in Madhya Pradesh, India’s largest
  • Energy storage made mandatory for RE generation plants effective July 2027
  • SPML Infra’s BESS battery pack completes key global certification & testing requirements
  • Aditya Birla Group launches wires and cables business — ‘Ultravolt’
  • India’s power transmission constraints could persist for years: Aurora Energy Research
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.