• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • New Products

Eastman introduces grid-tie solar PV inverter

  • T&D India
  • February 15, 2018
Eastman
Share

Eastman Auto & Power Ltd has announced the launch of its grid-tie solar PV inverter, which according to the company’s statement, is amongst the most advanced such inverter in the Indian market.

Eastman’s grid-tie solar PV inverters come with modular design, stronger grip, and support. It is compact, light-weight and energy efficient. It is 40 per cent lighter compared to industry standards.

Eastman’s grid-tie solar PV inverter is designed under the latest applied scientific automation. These inverters are technologically exceptional solar devices for residential homes and commercial segments. Light-weight and compact design makes the series suitable for long-distance transportation and favourable for indoor and outdoor installation. It is designed to adhere to extreme weather condition with maintenance efficiency.

The advanced MPPT algorithm gives a peak efficiency of 99.9 per cent and wide MPPT voltage range of 100 to 490V DC and guarantees maximum power generation in compliance with the IEC standards of safety. Eastman’s grid tie solar PV inverter is available in four different models- 1KW, 3KW, 5KW and 10KW which are also certified under IEC standards.

Some core features of the inverter include: IP65 protection, wide operating PV voltage range, compact and light weight, peak efficiency up to 98 per cent, quick and easy installation and maintenance free.

Tags
  • Eastman
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
ABB installs EV fast-charger station at NITI Aayog
Adani Group appoints Paresh Chaudhry

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Bondada Engineering wins EPC contract of India’s first grid-scale VRFB-BESS project
  • CG is well positioned to make the most of the strong demand environment
  • Tata Power wins SECI mandate, to supply 324 MW power from its Bhivpuri PSP
  • PGCIL wins India’s first pure SynCon project under TBCB
  • Havells India posts 27 per cent growth in cable business revenue in Q1FY27
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.