• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • Orders & Contracts

Larsen & Toubro wins significant order from Nuclear Power Corporation

  • T&D India
  • September 16, 2025
Share

Larsen & Toubro has announced the winning of a significant order from Nuclear Power Corporation of India Ltd (NPCIL), in Tamil Nadu.

In a release, L&T said that its Heavy Civil Infrastructure (HCI) business vertical has won a “significant” order from NPCIL relating to the upcoming 2×1,000 MWe Kundankulam Nuclear Power Project – Units 5 & 6 (KKNPP-5&6) in Tamil Nadu.

The scope of the order encompasses the mechanical package for the project, including installation of the nuclear reactor and turbine systems (with generator and condenser), sea water systems, polar and trestle cranes, and other related equipment. It also includes accessories, piping, supports, structural steelwork, painting, anti-corrosion coating, insulation and full testing across various buildings and structures on site.

“The order reinforces L&T’s track record and proven expertise in delivering complex and large-scale nuclear power infrastructure projects for India’s clean energy mission,” the L&T release said.

Though L&T did not disclose the exact value of the order, it is estimated to be in the region of Rs.1,000 crore to Rs.2,500 crore, based on L&T’s classification of a “significant” order win.

 

KKNPP

Based on information released by NPCIL, the KKNPP-5&6 project is located in Tirunelveli district of Tamil Nadu. It is an extension of the already-operating KKNPP-1&2 (2×1,000 MWe) and the under-construction KKNPP-3&4 (also 2×1,000 MWe).

KKNPP-5&6 entails commissioning of two atomic power generation units of 1,000 MWe each, based on light water reactors. The project is being implemented in technical collaboration with Russian Federation.

Once KNPP-3,4,5&6 is commissioned, the total capacity of the Kudankulam Nuclear Power Station (KKNPS) will rise to 6,000 MWe from the current 2,000 MWe.

As of July 31, 2025, India’s nuclear power generation capacity stood at 8,780 MWe, entirely owned by NPCIL.

Also read: Larsen & Toubro arm partners with Japan’s ITOCHU for green ammonia project

Featured photograph is for representation only

 

Tags
  • KKNPP
  • KKNPS
  • Kundakulam
  • L&T
  • Larsen & Toubro
  • NPCIL
  • Tamil Nadu
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Transmission line addition meets over 90 per cent of target
Suzlon Group wins 838-MW order from Tata Power Renewable Energy, its largest in FY26 so far

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Atlanta Electricals closes Q1FY27 with order book of over Rs.3,000 crore
  • Kimbal establishes Australia and New Zealand headquarters in Victoria
  • TARIL: Order inflow more than trebles in Q1FY27
  • Bondada Engineering wins EPC contract of India’s first grid-scale VRFB-BESS project
  • CG is well positioned to make the most of the strong demand environment
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.