• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • T&D News

PFCCL transfers two ISTS schemes to winning developer PGCIL

  • T&D India
  • August 23, 2024
Share

Bid process coordinator PFC Consulting Ltd (PFCCL) has transferred two project special purpose vehicles related to interstate transmission system (ISTS) schemes to Power Grid Corporation of India Ltd (PGCIL) – the winning developer under the tariff-based competitive bidding (TBCB) mechanism.

In a stock exchange filing, Power Finance Corporation Ltd, the holding company of PFCCL, said that it the formal transfer of the two SPVs, which were incorporated as wholly-owned subsidiaries of PFCCL, was completed on August 22, 2024.

 

Here are details of the two cases:

Project SPV: Sirohi Transmission Ltd
ISTS Scheme: Transmission system for evacuation of power from Rajasthan REZ Phase-IV (Part 2: 5.5 GW) (Jaisalmer/Barmer Complex) Part B
Location: Rajasthan
Project scope: Establishment of new 765/400 kV substation near Sirohi in Rajasthan, 765kV and 400kV double-circuit transmission lines and associated bays extension works at existing substations (Chittorgarh and Fatehgarh-IV) in Rajasthan.

 

Project SPV: Beawar-Mandsaur Transmission Ltd
ISTS Scheme: Transmission system for evacuation of power from Rajasthan REZ Phase-IV (Part 2: 5.5 GW) (Jaisalmer/Barmer Complex) Part D
Location: Rajasthan and Madhya Pradesh
Project scope: Establishment of 765kV double-circuit transmission line and associated bay extension works at existing substations in Rajasthan (Beawar) and Madhya Pradesh (Mandsaur)

 

The two schemes are together expected to cost around Rs.5,500 crore, according to cost estimates made by National Committee on Transmission (NCT). Each scheme will have a gestation period of 24 months.

According to information available with T&D India, PGCIL had received the letter of intent from PFCCL for development of these two schemes on May 9, 2024. There has therefore been a time lapse of nearly three and a half months in the formal transfer of SPVs. As per the standard bid documents, the transfer of SPV needs to take place within ten days of receiving the letter of intent.

Also read: PFCCL incorporates three project SPVs for ISTS-TBCB schemes

ISTS-TBCB in FY25

During the current fiscal year so far (up to August 22, 2024), a total of nine ISTS-TBCB schemes have been formally transferred to successful developers, according to T&D India estimates, with PGCIL landing a predominant majority.

Bajel Projects | T & D India
Tags
  • Beawar
  • interstate TBCB
  • ISTS
  • ISTS-TBCB
  • Madhya Pradesh
  • Mandsaur
  • PFCCL
  • PGCIL
  • Rajasthan
  • Sirohi
  • TBCB
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
PGCIL dominates ISTS-TBCB market with 60 per cent share
IEEMA launches “Industry Conclave 2024” to drive industry transformation

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • CEA seeks suggestions for indigenous development of critical imported items
  • Infravision is thrilled to welcome Pradeep Kumar to the team as CEO, India.
  • Joda-Barbil intrastate scheme in Odisha: Bidding annulled for the second time
  • Sugs Lloyd wins power T&D projects in Bihar and Odisha
  • H.G. Infra Engineering emerges L1 for ERGS-I scheme in Odisha
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.