• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • News

Schneider Electric Infrastructure plans major capacity expansion for circuit breakers

  • T&D India
  • May 30, 2025
Share

Schneider Electric Infrastructure Ltd (SEIL) has planned a major expansion in manufacturing capacity of circuit breakers.

This expansion is part of an overall investment plan of around Rs.200 crore that includes capacity expansion of switchgear panels as well.

According to an investor presentation, SEIL will be investing Rs.90.60 crore in setting up a new circuit breaker plant at Kolkata. This new plant, which is expected to commission within FY27 (before 31 March 2027) will have breaker manufacturing capacity of 40,000 units per year.

This will take SEIL’s total breaker capacity to 45,000 units per year, which is as astounding nine times its existing capacity of 5,000 units.

It is further learnt that the new plant will manufacture new-generation breakers meant to serve both the domestic and international markets.

The switchgear panel capacity expansion will take place at the existing Vadodara plant in Gujarat. The present capacity of 8,000 panels per year will be enhanced by 6,000 panels, taking the final capacity to 14,000 panels per year. This expansion plant, with an outlay of Rs.110.20 crore, will be commissioned during FY27.

Both the expansion plans will be financed largely through internal accruals, it is learnt.

 

Transformer plant

SEIL is also expected to commission capacity expansion at its transformer manufacturing facility at Vadodara in Gujarat, by March 2026. With an outlay of Rs.13.6 crore, the plan is to expand capacity by 1,500 MVA, to reach 7,000 MVA per year, with a view to meeting growing market demand.

 

Order inflow & backlog

During FY25, Schneider Electric Infrastructure Ltd recorded an order inflow of Rs.2,693 crore that was 13.4 per cent higher than Rs.2,375 crore.  As of March 31, 2025, SEIL’s order backlog stood at Rs.1,253 crore.

Also read: Schneider Electric announces launch of “Galaxy VXL” UPS

Tags
  • CORPFY25(A)
  • Schneider Electric
  • Schneider Electric Infrastructure Ltd
  • SEIL
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
Adani Electricity inaugurates 220kV digital substation in Mumbai
Stability and resilience must go hand in hand with grid expansion: Dastur Energy

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Atlanta Electricals closes Q1FY27 with order book of over Rs.3,000 crore
  • Kimbal establishes Australia and New Zealand headquarters in Victoria
  • TARIL: Order inflow more than trebles in Q1FY27
  • Bondada Engineering wins EPC contract of India’s first grid-scale VRFB-BESS project
  • CG is well positioned to make the most of the strong demand environment
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.