CEA

India misses generation capacity addition target in FY20

India has missed attaining its conventional power generation capacity addition target in FY20, by a rather wide margin, latest CEA statistics suggest. For FY20, India had a power generation capacity addition target of 12,186 mw against which only 7,065 Read more

CEA

CEA targets 6pc power generation growth in FY21

Central Electricity Authority (CEA) has fixed the annual power generation target for FY21 at 1330 BU, implying a 6.2 per cent growth over the actual generation level of FY20. The FY21 power generation target is 6.2 per cent higher Read more

CTC

India falters on power transmission upgrade in FY20

India could add barely 50 per cent of the targeted power transmission line capacity in FY20, according to statistics recently released by Central Electricity Authority. As against the planned addition of 23,621 ckm (circuit km) of transmission lines, the Read more

CEA

CEA prepares its first-ever plan on power distribution reforms

Union power minister R.K. Singh recently reviewed the Draft Distribution Perspective Plan for power sector in India. The draft plan is the first ever plan at Distribution level which has been prepared by Central Electricity Authority (CEA) under Read more