• About Us
  • Reach Us
  • Amber Media LLP
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
  • Special Stories
    • Lead Story
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Orders & Contracts

RMC Switchgears receives “held-up” orders

  • T&D India
  • February 9, 2022
RMC Switchgear Plant | T&D India
Share

 

RMC Switchgears has said that the company has received orders from various state electrical utilities, which were held up due to the pandemic-related reasons.

In a stock exchange filing dated February 9, 2022, Jaipur-based RMC Switchgears said that tender contracts that were delayed to the COVID-19 fallout are now being finalized.

The company added that it has won tenders worth over Rs.100 crore from various state electrical utilities, in the last 30 days. These orders will be fulfilled over the next six months, the filing said.

Also read: Veto Switchgears Acquires Stake In Vankon Modular

Incorporated in 2007, RMC Switchgear is engaged in the business of designing and manufacturing of enclosures of energy meters, LT/HT distribution boxes and panels, junction boxes, feeder pillars and other power distribution and circuit protection switchgears made from mild steel, stainless steel in fabrication and deep drawn process along with sheet moulding compound and bulk moulding compound (DMC) materials.

The company also undertakes contracts involving laying of energy transmission lines and establishing electric substation, fixing of new energy meters and shifting of existing energy meters etc in different regions of the country.

 

Featured photograph ostensibly shows RMC Switchgear’s manufacturing plant in Rajasthan. (Photo: Google Images/Rahul Mahipal)

Bajel Projects | T & D India
Tags
  • Rajasthan
  • RMC Switchgears
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
GE to exit GE Power India over the next 36 months
SJVN plans 10 GW solar power portfolio in Rajasthan

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Akhilesh Kumar Dixit appointed CEO of EESL
  • Failure of 28 EHV transmission lines reported to CEA in 2024
  • EconiQ: Pioneering a Sustainable Future for Power Grids
  • Power minister inaugurates grid upgrade projects in UT of Jammu & Kashmir
  • CEA seeks suggestions for indigenous development of critical imported items
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2025 All rights reserved | Site Owned by Amber Media.