• About Us
  • Reach Us
  • Amber Media LLP
  • Sign Up
  • member login
Your Gateway to Power Transmission & Distribution
  • Home
  • News
    • T&D News
    • Power Equipment
    • Power Distribution
    • International News
    • New Products
    • Orders & Contracts
    • Renewables
    • New Appointments
    • In Brief
    • Awards & Accolades
    • E-mobility
  • Interview
  • Special Report
    • Special Stories
    • Special Story
  • By Invitation
  • Events
  • Monthly Issues
  • Sign In
    • Login
    • Sign Up
  • T&D News

All five project SPVs of Gujarat 14-GW RE scheme transferred to winning developers

  • Venugopal Pillai
  • October 13, 2026
Share

In a very significant development, all the five project SPVs corresponding to TBCB components of the mega 14-GW RE evacuation scheme in Gujarat were transferred to their respective winning developers on October 12, 2026.

While bid process coordinator PFC Consulting Ltd (PFCCL) transferred three schemes, REC Power Development & Consultancy Ltd (RECPDCL) did so with two.

Power Grid Corporation of India Ltd (PGCIL) was most successful in acquiring three of the five project SPVs while Ceigall India Ltd and AnantGrid Projects One Pvt Ltd acquired one each.

 

Project Background

The 14-GW RE evacuation plan has three broad components. The first relates to Jam Khambaliya (Phase-II, 5.5 GW) and Jamnagar (Phase-I, 1 GW). The second is associated with Lakadia (Phase-II, 7.5 GW).

The third component will deal with the common transmission system for the two aforementioned components. This component has been divided into three parts – Part A, Part B and Part C.

This gives a total of five components, with each component bid out as an independent ISTS-TBCB scheme. (Learn more)

 

Mapping of project SPVs

 

 

Winner status

The summary of the five project SPVs along with their respective winner is summarized below:

 

tndindia.com has been extensively covering progress on the 14-GW Gujarat RE evacuation project, and has exclusively reported the winning developers even before formal announcements were made. Here are some relevant stories:

  • Flash News: AnantGrid likely to clinch Lakadia-A ISTS-TBCB scheme (7-Aug-26)
  • Ceigall India set to enter interstate-TBCB development space (26-Aug-26)
  • PGCIL moves closer to winning Lakadia-II ISTS-TBCB scheme (31-Aug-26)
  • PGCIL most likely to win Lakadia-C interstate scheme, emerges L1 (17-Sep-26)
  • PGCIL most likely to clinch Jam Khambhaliya REZ ISTS-TBCB scheme (19-Aug-26)

 

Featured photograph shows the formal transfer of “Lakadia II Power Transmission Ltd” from RECPDCL to PGCIL, on October 12, 2026. (Photo: RECPDCL)

 

Tags
  • 14-GW RE Gujarat
  • AnantGrid
  • Ceigall India
  • Gujarat
  • interstate TBCB
  • ISTS-TBCB
  • Jam Khambhaliya
  • Jamnagar
  • Lakadia
  • PFCCL
  • Power Grid Corporation of India
  • RECPDCL
  • Share this post
  • twitter
  • pinterest
  • facebook
  • google+
  • email
  • rss
PGCIL commissions interstate RE evacuation scheme in Rajasthan
Resonia commissions two transmission projects in Rajasthan

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Subscribe to our Newsletter

Recent Posts
  • Resonia commissions two transmission projects in Rajasthan
  • All five project SPVs of Gujarat 14-GW RE scheme transferred to winning developers
  • PGCIL commissions interstate RE evacuation scheme in Rajasthan
  • MERC grants transmission licence to Jalna intrastate-TBCB scheme in Maharashtra
  • Tata Power Renewable Energy commissions 419 MW of utlity-scale projects in Q2FY27
Your Gateway to Power Transmission & Distribution

We invite you to consider sustained advertisement campaigns in “T&D India” We assure you of unmatched exposure at very cost-effective rates. for more details please mail us at info@tndindia.com

  • About Us
  • Amber Media LLP
  • Sitemap
  • IndiaPowerFactor
  • Contact Us
© 2016-2026 All rights reserved | Site Owned by Amber Media.